Switzerland has received its first tranche of WFEL Dry Support Bridges (DSBs) in a ceremony which included a live build-and-installation of the DSB to an audience of senior army personnel, army engineers, guests from WFEL and the Swiss media. A total of four of the 46m span DSBs were handed over to armasuisse - the Swiss defence procurement agency - prior to final delivery to the Swiss Army.
![]() |
Just eight soldiers and a single launch vehicle can have traffic rolling across a 46 metre gap in less than 90 minutes using an Dry Support Bridge (DSB). |